Created by Camila Gill
Tuesday
The Hallmark Achievement of Awesomeness That Has a Terrible Underlying Meaning
Congrats on the 100 views guys!!!! I always knew that this day would come! It's the day that school work was popular. Actually, this is bad because schoolwork is not supposed to be cool.
Run away while you still can...
~Random Guy
RGA Foundation Floor Plan
Created by Jason Boone
The foundation plan is the foundation to all our plans. In my opinion there were too many layers of this drawing that were drawn in bright colors. Enough about opinions, this is a class about fact.
Fact: I learned there is a gap between the brick veneer and the wall.
Fact: I learned there is gravel or sand under the slab of concrete.
Fact: I learned there is a gap between the porch slab and the main slab of concrete.
Fact: I learned there is anchor braces of a different variety outside the classroom.
Fact: I learned there is continuous re-bar across the slab.
Fact: I learned you can draw a filled circle by using the donut command and not filling it in.
Fact: I learned that blogspot says that donut is spelled wrong and I should change it to donuts.
Fact: I learned there is a line break tool that is easy to use.
RGA Roof Plan
Created by Camila Gill
Using the roof plan sketch, i was quickly able to form the rough plan of the roof. A 1' overhang was added along with a 5" roof beam. Arrows were added to the roof plan to indicated The roof slope. The process of calculating the roof ventilation toke two days, as the process to find the right calculations proved to be harder than expected. A table of the roof ventilation and calculations was inserted along with various notes pertaining to the roof plan. Overall the process toke longer than expected, when various errors were found a time was taken to change wrong to right, but i enjoyed making the roof plan and i am confident that i would be able to make one quicker and with less errors in the future.
Using the roof plan sketch, i was quickly able to form the rough plan of the roof. A 1' overhang was added along with a 5" roof beam. Arrows were added to the roof plan to indicated The roof slope. The process of calculating the roof ventilation toke two days, as the process to find the right calculations proved to be harder than expected. A table of the roof ventilation and calculations was inserted along with various notes pertaining to the roof plan. Overall the process toke longer than expected, when various errors were found a time was taken to change wrong to right, but i enjoyed making the roof plan and i am confident that i would be able to make one quicker and with less errors in the future.